Forum Title: Doors, Doors, Doors
I'm currently replacing 11 door slabs in a house that sat empty for two years without being properly winterized. Busted pipes, water damage, yada yada. Every frickin' jamb is out of kilter by 1/2-1 vertically, side to side or both, and some are curved as well. Walls on each side lean in opposite directions. The floors are no better. HO thinks he got a good deal on the house (he didn't). On the bright side, it's by the hour. OTOH, as soon as I'm done with this, I'm going directly across the street in the same development to do 9 doors. That's by the hour too. I feel better now; thanks. Dustily yours, Tin
Category: General Contractor Post By: BRYAN COLEMAN (Cincinnati, OH), 03/03/2018

Homeowners Tips & Helpful Links

requestaquote Get Free Quotes callnow 888-506-9527